Flood Mitigation

During the summer of 2018, the City of Albany experienced several extreme rain events that caused flooding and sewer backups in several areas throughout the City. The Water Board is committed to system wide infrastructure improvements to address these decades-long problems and improve the quality of life for Albany residents.

Immediate Actions

To help reduce the chance of flooding in the short term, Albany Water Department (AWD) crews have been performing increased inspections of sewer infrastructure, clearing debris from storm drains and sewers, and increasing inlet capability to allow for better flow of water. The department is also prioritizing locations that experienced recent flooding as areas to monitor and respond to during future rain events.

What You Can Do

Please report all flooding and backups. Call Water Dispatch at 518-434-5322. This information will help in the planning of system-wide improvements.

Install a Backwater Valve. A backwater valve will help protect against sewer backups and AWD currently offers a $2,000 reimbursement program to help with the costs of installation. All backwater valves should be inspected annually to ensure the flapper valve is intact and functional. Find out more at: Backwater Valve Grant

Long Term Improvements

The department’s upgrades to the sanitary, storm, and combined sewer system has been focused on sewer separation and flood mitigation projects. The goals of these projects are to either separate the storm water flow from the combined sewer or to provide stormwater storage and retention. Over the past five years, we have increased these efforts throughout the city, using underground detention galleries, groundwater recharge, constructed wetlands and green infrastructure.

Completed Projects

Quail St. Green Infrastructure Project

The project was a demonstration project and is collects the first three inches of rainfall in separated storm sewers and porous pavement in the maintenance areas between sidewalks and curbs. This runoff is directed to bio-retention basins below grade, and returned to the combined sewer system once the flow in the sewer subsides.

Elberon Place CSO Abatement and Flood Mitigation Project

New stormwater catch basins and pipe have been installed to convey rainwater separate from the large diameter combined sewer pipe under Elberon Place. See more at: Elberon Place CSO Abatement and Flood Mitigation Project

Hansen Alley Overflow Abatement and Flood Mitigation Project

Stormwater runoff is now collected in new separated storm sewer pipes and conveyed to the underground detention chamber system in left and center field of Central Babe Ruth. See more at: Hansen Alley Overflow Abatement Flood Mitigation

Ryckman Alley Overflow Abatement and Flood Mitigation Project

Stormwater runoff will now be collected in existing separated storm sewer pipes and conveyed to the new created wetland in Woodlawn Park. See more at: Ryckman Alley Overflow Abatement and Flood Mitigation

Projects Underway

Beaver Creek Phase 6 - Over 20 years ago the Albany Water Board initiated stormwater sewer separation around Albany High School, and at several other locations on the Beaver Creek sewer shed. This work was referred to as Beaver Creek Phases 1-5.  Upon completion of the retrofit of these projects, and new stormwater detention installed by the Albany School District, AWD will have over 2 million gallons of separated storm sewer controlled by real time controls.  This project is scheduled for completion in the spring 2019.

Upper Washington Corridor Waste Water Pump Station and Force Main Project - Currently out to bid, this project involves the installation of a pump station and force main to divert up to 3 million gallons per day of sewage out of the Beaver Creek trunk sewer.  Expected completion is fall of 2019.

Green Infrastructure projects also help in flood mitigation. Learn more about current Green Infrastructure projects in Albany 

Future Projects

The department will continue to plan, design, and implement projects to increase the capacity of the combined sewer system through additional system-wide sewer separation and detention/storage. Funds are dedicated in the annual capital budget and five-year Capital Improvement Plan specifically to implement these projects as part of our commitment to flood mitigation.

This summer, the department applied for grant funds through the Consolidated Funding Application program for CSO mitigation and flood abatement projects in the Hackett Boulevard Corridor ($8.8 million) and Sheridan Avenue/Sheridan Hollow ($5.22 million). These projects are a combination of grey and green infrastructure practices that will further mitigate flooding and related impacts to the effected neighborhoods.