Water

WAT-2019-1_FeuraBush1

Project Status:  

Complete

Finance Status:  

In Process

Start Date: 

2018

End Date: 

2023

Project Category: 

Water Filtration Plant Upgrades

Network: 

Water

Project Title:

Feura Bush Water Filtration Plant Phase I

Project Description:

 - Lagoon 2: Construction to stabilize the slope and reconfigure a portion of Lagoon 2. The project also incorporated several additional site improvements to support short- and long-term operations.
 - Sedimentation Building: Construction to replace roof, louvers, and sections of wall masonry and install a vapor barrier at the Sedimentation Building, along with electrical upgrades • Sodium Permanganate: Installation of a Sodium Permanganate Feed System and associated electrical components at the Alcove Reservoir. 
 - Electrical Upgrades: Construction of a new electrical room, replacement of main electrical disconnect, automatic transfer switch, motor control centers, and distribution panels. 


-------------------------------------------------------------------------------------------------------------------------------------------------------
WAT-2022-1_FeuraBush_900x2100

Project Status:

Construction

Finance Status:

2021 Bond

Start Date: 

May 2023

End Date:

May 2024

Project Category:

Water Filtration Plant Upgrade

Network:

Water

Project Title:

Valves & Actuators

Project Description:

Replacement of many components of the Filtration Basins at the Feura Bush Water Filtration Plant:

 - Stop Log System (8) - demolition of existing channels and stop log system and installation of new stop logs, channels, and mounting components required for a watertight system;

 - Influent Valve (1) - demolition of existing 36” influent valve and installation of new valve and actuator;

 - Filter Effluent Control Valves (8) - demolition of existing 16” filter effluent control valves and installation of new valves, actuators, and flowmeter;

 - Filter Air Scour Valve (7) - demolition of existing 12” air scour valve and installation of new valve and actuator (supplied by AWB);

 - Sluice Gates (8) - demolition of existing 24”x24” filter influent sluice gate assembly and installation of new sluice gates, actuators, and all necessary components required for watertight gates;

 - Main Wash Water Valve (1) - demolition of existing 30” main wash water control valve and installation of new main wash valve and actuator;

 - Filter Rewash Valves (8) - demolition of existing 10” filter rewash actuators and installation of new actuators (supplied by AWB);

 - Filter Wash Water Valve (8) - demolition of existing 24” filter wash actuators and installation of new actuators;

 - Filter Drain Valves (8) - demolition of 30” filter drain valve actuators and installation of new actuators.

-------------------------------------------------------------------------------------------------------------------------------------------------------
WAT-2022-2_Loudonville

Project Status:

Construction

Finance Status:

2021 Bond

Start Date:

May 2023

End Date:

May 2024

Project Category:

Water Filtration Plant Upgrades

Network:

Water

Project Title:

Loudonville UV Upgrades

Project Description:

 - Existing UV Reactors, Lamps, UVT Transmitters, Flowmeters, and Associated Controls including Operator Interface Screens, Programmable Logic Controllers (PLCs), and SCADA Hardware Cabinets are more than 20 years old and are past their useful life and have become obsolete, with replacement parts no longer available. Four new Medium-Pressure UV Reactors & Lamps and ancillary equipment were procured in 2022 and delivered in 2023 from Trojan Technologies.

 - Demolition of the existing system and installation of new reactors, piping, and electrical wiring and conduits began in June 2023. Installation of Operator Interface Screens, PLCs, Hardware Cabinets, and integration of the new equipment to SCADA

WAT-2022-3-FeuraBush1

Project Status:

Preliminary Design

Finance Status:

TBD

Start Date:

January 2023

End Date:

January 2025

Project Category:

 - Water Filtration Plant Upgrades


- Reservoir System Upgrades
- Potable Water Pump Station Improvements

Network:

Water

Project Title:

Feura Bush Water Filtration Plant - Phase II

Project Description:

 - Aeration Building Upgrades: Damp-proof Aeration Room, rehabilitation of concrete tanks, columns, and masonry; Installation of new louvers and lighting 

- Liquid Lime System & Maintenance Garage: Installation of a permanent liquid lime system, electrical upgrades, and SCADA integration to improve corrosion control in water distribution system; Construction of new maintenance garage for equipment and housing of lime mixing tanks

 - Loudonville Basin C: Renovation of inlet tower and addition of a bridge to allow for inspection and installation of a mixer or aerator.

  - Mixing Basins: Partial renovation of mixing basins at Water Filtration Plant


-------------------------------------------------------------------------------------------------------------------------------------------------------
WAT-2023-1_HarrimanCampus

Project Status:

Preliminary Design

Finance Status:

Bond

Start Date:

October 2023

End Date:

May 2024

Project Category:

Potable Water Pump Station Improvements

Network:

Water

Project Title:

Harriman Pump Station Upgrades

Project Description: 

- Replacement of pumps and electrical system upgrades to the finished drinking water at the Harriman Campus Pump Station

-------------------------------------------------------------------------------------------------------------------------------------------------------
WAT-2023-2_Loudonville

Project Status:

Pre-Construction

Finance Status:

Bond

Start Date:

October 2023

End Date:

November 2023

Project Category:

Potable Water Pump Station Improvements

Network:

Water

Project Title:

Loudonville Pump Station Upgrades

Project Description:

 - Replacement of pumps and piping at the Loudonville Pump Station to provide finished drinking water to the Upper Service Elevated Storage Tank at Loudonville Reservoir. 

-------------------------------------------------------------------------------------------------------------------------------------------------------
WAT-2024-1_FeuraBush

Project Status:

Planning Phase

Finance Status:

Grant

Start Date:

TBD

End Date:

TBD

Project Category: 

 - Water Filtration Plant Upgrades
 - Potable Water Pump Station Improvements
 - Elevated Water Storage Tank Improvements

Network:

Water

Project Title:

Feura Bush Water Filtration Phase II

Project Description:

 - Filter Upgrades: Upgrades of media filters and underdrains in filter gallery at Water Filtration Plant.

- Pine Bush Pump Station: Upgrade of HVAC and MEP support systems and architectural renovations.

- Pine Bush Elevated Tank: Interior Coating and Repairs to elevated finished water storage tank in the Pine Bush.

- Upper Service Area Elevated Tank: Interior Coating and Repairs to elevated finished water storage tank at Loudonville Reservoir.

- Clearwell Rehabilitation: Inspection of interior of Clearwells at Water Filtration Plant and rehabilitation of any imperfections to the tanks and baffles. 

-------------------------------------------------------------------------------------------------------------------------------------------------------
WAT-2024-2_Basic

Project Status:

Planning Phase

Finance Status:

Grant

Start Date:

TBD

End Date:

TBD

Project Category:

Reservoir System Upgrades 

Network:

Water

Project Title:

Basic Creek Reservoir

Project Description: 

- Work at Basic Creek Reservoir Dam to bring the facility into compliance with NYSDEC Dam Safety Standards for a Class C High Hazard dam. Modifies the existing spillway crest by a two-stage piano key weir at the same location to accommodate  large storm events.

-------------------------------------------------------------------------------------------------------------------------------------------------------
WAT-2024-4_RennselaerLake

Project Status:
Planning Phase

Finance Status:
Grant

Start Date:
TBD

End Date:
TBD

Project Category:
Reservoir System Upgrades

Network:
Water

Project Title:
Rensselaer Lake Dam Upgrades

Project Description:
 - Work at Rensselaer Lake Reservoir Dam to bring the facility into compliance with NYSDEC Dam Safety Standards for a Class C High Hazard dam.