Sewer

SEW-2022-1_NorthernBlvd_900x2100
SEW-2022-1_MarlboroughCt_900x2100

Project Status:  

Construction

Project Status: 

Construction

Finance Status:

Grant Executed

Start Date: 

August 2022

End Date: 

May 2023

Project Category: 

Improvements: 
 
- Sanitary Sewer
 - Sanitary Pump Station 

Network: 

Sewer

Project Title: 

CIPP 2022 & 2023 Upgrades

Project Description:

Approximately 20,500 LF of Cured-In-Place (CIPP) sanitary sewer lining for pipes with diameters ranging from 10" to 30" throughout the City to rehabilitate sewers and reduce I/I. Upgrades to Marlborough Court and Northern Boulevard sanitary pump stations, including pump replacement, force main replacement, wet well installation, flow meter and flow meter manhole installation, comminutor installation, electrical upgrades, and SCADA integration.


-------------------------------------------------------------------------------------------------------------------------------------------------------
SEW-2024-1_ThurlowTer_900x2100

Project Status:

Preliminary Design

Finance Status:

Pending

Start Date: 

April 2024

End Date: 

November 2024

Project Category:

CSO Mitigation 
Stormwater Separation 

Network:

Sewer

Project Title: 

Thurlow Terrace Stormwater Separation

Project Description:

Sewer separation consisting of approximately 1100 LF of 48” HDPE storm pipe, a hydrodynamic separator, and a flow splitting manhole that is able to convey the 100-year storm, discharging for detention in Washington Park Lake. The project serves to

to improve water quality in the Hudson River by relieving downstream system surcharging, mitigate CSOs, and reduce areal flooding during extreme rainfall events.


-------------------------------------------------------------------------------------------------------------------------------------------------------
SEW-2024-2_LincolnPool_900x2100

Project Status:

Preliminary Design

Finance Status:

Pending WIIA Announcement 

Start Date

April 2024

End Date

November 2026

Project category:

 - Sanitary Sewer Improvements
 - CSO Mitigation 
 - Sanitary Pump Station Improvements

Network:

Sewer

Project Title:

Sewer Improvement Projects

Project Description:

Trunk Sewer Improvements – Beaver Creek at Lincoln Park Pool
 - Collection System Improvements
            a. Brick & Slate Sewer Replacement
            b. Trenchless Sewer Camera & Lining - Delaware Ave.

 - Sewage Pump Station Improvements
            a. Cellular Communications – SCADA Integration
            b. Emergency Generator Procurement & Installation
 - Combined Sewer Overflow Tide Gate Improvements
 - Flow Meters for I&I Detection & Reduction
          a. County Interceptor Sewer Connections
          b. Hudson River Interceptor
 - Optimize Flows to South WWTP
         a. State Street Regulator Connection to Hudson River Interceptor
         b. Diversion from Beaver Creek Phase I to Separated Storm